For housing providers & Responsible Persons

Your register. Your evidence. Whoever does the work.

The Responsible Person carries the duty — but the records usually live in a contractor's spreadsheet. MyQTAG keeps a live fire safety register on the building itself, so the evidence survives every change of contractor.

Free when your contractor connects you · nothing to set up, nothing to pay

The buildings table, one row per building with its postcode, QTAGs and compliance

The duties, and the records behind them

What the regulations ask of you — and how it's evidenced.

The Duty

Reg 10 · Communal Fire Doors checked every 3 months, self-closers tested

The Record in MyQTAG

A dated check per door, with photos and an action plan where an issue is found — filed against that door's tag

The Duty

Reg 10(5) · Flat Entrance Doors annual best-endeavours checks, access attempts recorded

The Record in MyQTAG

The door check plus a repeating log of every letter, visit and refusal — the part audits actually probe

The Duty

Reg 7 · Lifts & Fire-Fighting Equipment monthly checks; faults not fixed in 24 h reported to the fire service

The Record in MyQTAG

Monthly check records per building, and a fault record tracking the report to the FRS and the fix

The Duty

Residential PEEPs (2025 Regulations) identify relevant residents, assess, agree statements, share with the FRS

The Record in MyQTAG

Identification attempts, person-centred assessments, evacuation statements and the four items shared — with review dates

The Duty

Information Duties secure information box, plans with the FRS, wayfinding signage, resident information

The Record in MyQTAG

Annual box and signage checks, plan versions, and a record of what was issued to residents and when

Fire Safety (England) Regulations 2022 and the Residential PEEPs Regulations 2025, per Home Office and MHCLG guidance.

The golden thread, kept

A register that survives contractor churn.

Every asset carries a durable QTAG. Your estate is modelled the way you hold it — site, block, floor, location, with UPRNs — and every check is filed to the asset, not to whoever happened to do it.

  • Change contractor: the new firm scans the same tags and carries on the same history
  • Resident, auditor or fire officer asks? Produce the record for any door in seconds
  • Evidence once given is kept — detaching a project never takes back past reports
  • Export everything, any time — your data is never held hostage
A floor plan with inspection pins dropped on it

Start free, upgrade when you're ready

Two ways to hold the record.

Free · your contractor connects you

Read the evidence

  • Compliance dashboard and live register across every connected contractor
  • Approved reports and branded PDFs only — never drafts
  • Buildings, assets and floor plans, read-only
  • Due, overdue and upcoming visits
  • Take a full copy if a contract ends

£0 — nothing to set up, nothing to pay, ever

Premium · per building

Run the register yourself

  • Own the building record; invite any contractor to work inside it
  • Suggested statutory schedules — Reg 10 doors, Reg 7 monthly checks — applied per building
  • Raise works projects straight from the Overdue list and hand them to a contractor
  • Your own staff capture routine checks on the app
  • Traced floors and 3D on your own buildings

UK hosted

Data held in London; UK GDPR, with a DPA available

Roles & audit

Read-only client access; every action attributed and timestamped

Export anytime

Reports, registers and data leave with you in open formats

Security

Security overview published; certifications in progress.

Features

Everything a building manager needs to evidence compliance.

Compliance dashboard

Percentage in date, overdue by building and the next visit, live across every contractor connected to your estate.

Live asset register

Every tagged door and seal by site, block and floor, pinned on the floor plan with its full inspection history.

Approved reports only

Branded PDFs arrive the moment your contractor approves the work; drafts and internal review never reach you.

Due & overdue

Upcoming visits and every check falling due across the estate — and with Premium, raise a works project straight from the Overdue list.

Bring a floor plan to the demo.

We'll trace one building live and show your doors on the plan, coloured by compliance, before the call ends.